Simulation of Bored Pile Construction
- Tags:
- Productivity,
- Purdue University
- Source:
- Purdue University
FREE Registration is required
Overview: The installation of pile foundations is complicated by an enormous number of problems. They include unseen sub-surface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Two simulation models have been designed and validated to assess piling process productivity and cycle time. Consequently, two sets of charts have been developed based upon the validated models to provide the decision-maker with a solid planning, scheduling and control tool for piling projects.
(Is this item miscategorized? Does it need more tags? Let us know.)
Format: PDF | Size: 307KB | Date: Nov 2001 | Pages: 9
People who downloaded this item also downloaded
![]() |
Lean Construction and Simulation |
Top results from Construction Services and Home Improvement
» View all Construction Services and Home Improvement listings




