Cambria County Prison: Pennsylvania
- Topics:
- Mechanical and Industrial
- Source:
- Geothermal Heat Pump Consortium
FREE Registration is required
Overview: The Cambria County Prison, completed in 1997, is located in a mountainous area of Western Pennsylvania. The ASHRAE 62-1989 fresh air ventilation requirement accounted for 50% of the building heating and air conditioning requirements. The initial HVAC option was an electric chiller and a gas boiler with a variable air volume (VAV) air distribution system. GPU Energy, the electric utility, suggested that the county consider a GeoExchange (geothermal heating and cooling) system for the new prison.
(Is this item miscategorized? Does it need more tags? Let us know.)
Format: PDF




