University of Mississippi Wins Big With On-Site Generation & Load Curtailment
- Topics:
- Electrical and Electronic
- Source:
- Power Measurement
FREE Registration is required
Overview: To guarantee reliable power when the utility curtailed its supply as per a load curtailment agreement, the University of Mississippi built an on-site 20 MW generation facility, enough to power the entire campus for 3 or 4 days without refueling. Power Measurement integrated an EEM system using ION 7600 meters and ION Enterprise software with Advanced Power Technologies (APT) power modules and switchgear to monitor and control generation.
(Is this item miscategorized? Does it need more tags? Let us know.)
Format: HTML



